first the tear down and seperating all the parts,redeck with redoak rewiring the graph ,bilge upgrade ,livewell pump upgrade,all three batteries upgraded,two for the motorguide the other for the main engine,redo the plumming for the live well,fix all hinges and latches ,remove all decals off wind shield go back to stock clear,remount downrigger mounts ,rod holder mounts ,then do the carpeting and reset everthing,,,,,,the little red boat is ready for some striper killing,,,,,,,,,,,,,